Will the signs being delivered to the installer's depot to transport onto site or are these delivered directly to the site?
The parts will be delivered to site, if you will order the crane to site. Highly requested is a transport to your stock and from there with hiab-truck on site.
Will they being delivered as 4 modules bolted together or are they separate and the installers bolt them together on site. Also is the installer to supply fused spurs for our teams to connect to?
The clips will be delivered in 4 complete assembled parts, the installer will have to connect the existing cabling (to attach 1 cable) and fix a profile (with 2 rivets) at the joints.
If it should be per item, the price of the crane would be included on all fascia modules and pylons with the effect that the price of an average site raises.
Pricing as described in the tender-file, including lifting equipment/crew mobilisation etc.